TDL Replacement – Oswestry to Legacy

The 132kV Heavy Duty Legacy to Oswestry Trident project was installed by BBUSL in 2015 with equipment supplied by SP Energy Networks. PACE supplied the Tension Insulators, E00897R-5 and the Line and Pilot Post Insulators, E00865A and E01054S to SP Energy Networks. The route modification is part of the 132kV Substation rebuild which is being up scaled to provide security and flexibility to the existing network in and around Oswestry. The insulators were manufactured to be exactly the same size as the trident specification from the eighties, therefore allowing a direct replacement of the existing old insulator technology and also providing huge savings in the reduction of change in other areas.

View more Case Studies

 

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

 
 

 

You might also be interested in reading...

 
 

PACE Stocking MLE Disconnectors

PACE and Morris Line Engineering recently confirmed they are expanding their long standing relationship to include PACE stocking MLE 1250Amp disconnector/switches.
Read More >

OMNIA’s 750MM Range of Adjustment

While UK Master Series shows a 500mm range of reach settings for Omnia, as Series 2 did previously, each Omnia version features a distance of 750mm between min and max range.
Read More >

Alternative Bonomi Bridge/Tunnel Arm Undergoing Testing

An alternative Bonomi Bonomi Bridge/Tunnel Arm design is currently undergoing testing in the UK as part of the ongoing drive to reduce the impact of bridge reconstruction on electrification projects.
Read More >

 
 
 
RIQS
RIQS
RIQS
RIQS