Connecting Technologies
T: +44 (0)1285 323 525    E:
PACE Networks
 

North West Electrification Programme

The electrification programme between Manchester and Liverpool was the trail blazer regarding recent UK conversion to electric trains. Being an early adopter of new technology and the Series 2 design range brought specific challenges, with minimal prior knowledge from other projects. PACE worked in close collaboration with Network Rail, Balfour Beatty and our partners to meet project needs and ensure component supply was effective and well communicated.

View more Case Studies

 

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

 
 

 

You might also be interested in reading...

 
 

PACE Stocking MLE Disconnectors

PACE and Morris Line Engineering recently confirmed they are expanding their long standing relationship to include PACE stocking MLE 1250Amp disconnector/switches.
Read More >

OMNIA’s 750MM Range of Adjustment

While UK Master Series shows a 500mm range of reach settings for Omnia, as Series 2 did previously, each Omnia version features a distance of 750mm between min and max range.
Read More >

Alternative Bonomi Bridge/Tunnel Arm Undergoing Testing

An alternative Bonomi Bonomi Bridge/Tunnel Arm design is currently undergoing testing in the UK as part of the ongoing drive to reduce the impact of bridge reconstruction on electrification projects.
Read More >

 
 
 
RIQS
RIQS
RIQS
RIQS