Connecting Technologies
T: +44 (0)1285 323 525    E: contact@pace-networks.co.uk

Back to all News »

Morris Line Training and Commissioning

Morris Line Training and Commissioning

Morris Line Engineering has supplied thousands of manual Rail Track Switches/Disconnectors across the UK rail network, complemented by approximately 1,500 motorised units. While these widely adopted devices have occasionally been assembled on-site from component parts, leading to complications in site setup and operation, Morris Line has collaborated closely with Network Rail to implement measures ensuring consistent installation practices. As part of this initiative, Morris Line Engineering emphatically discourages the use of non-MLE products, such as tension rods.

In a strategic move, Morris Line Engineering exclusively provides fully assembled switches rather than switches in kit form. This approach aims to eliminate common issues arising from kit-supplied switches, such as variations in contact spring pressures and contact alignment.

To facilitate the precise setup and operation of Morris Line Engineering’s versatile system, an intensive training course has been developed. This course, spanning three days, offers practical insights and comprehensive fault-finding information. It serves as an invaluable knowledge base for individuals working with Morris Line Engineering’s Track Switches. Importantly, the course is mandatory for those involved in commissioning MLE motorised isolators.

Numerous engineers from Network Rail and other organisations involved in the installation of Morris Line Engineering’s Track Switches have recently completed this course, with many more scheduled to attend. For further details or to secure a training space, please reach out to Morris Line Engineering or PACE today.

Morris Line Engineering is committed to constructing a dependable Rail Network!

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

You might also be interested in reading...

Matt Kiely-Smith Joins PACE Networks Rail Team

PACE Networks’ offering to Electrified Railways grew in 2023, and in line with this, we increased the team servicing that market with the addition of Sales Engineer Matt Kiely-Smith.
Read More >

Contact Wire Measurement on Rigid Catenary – Network Rail Approved

Hastec Rail gained another Network Rail approval for their range of state-of-the-art surveying equipment, their Con-Tec Beam. Contact PACE Networks today to discuss a demonstration or trial of the Con-Tec or Con-Tec Beam.
Read More >

New Products in PACE Networks Stocks

PACE Networks began stocking and distributing rail electrification products in 2018 and is constantly reviewing the range of components and sub-systems held in our warehouse.
Read More >

 
RIQS
RIA
ISO 9001
Achilles
Cyber Essentials