Connecting Technologies
T: +44 (0)1285 323 525    E:
PACE Networks
 

Mle’s 27m Demonstration Rig with Pear-drive Assembly

Morris Line Engineering are offering customers the chance to view a 27 metre installation of their pear-drive operating tube assembly at their factory in Bridgend. The installation demonstrates the simplicity of the design and its very impressive reach, as well give engineers a chance to get their hands on the product. It’s a busy time for Morris Line right now, with orders to Crossrail and Shenfield -Southend-Victoria, as well as product developments and new qualified installer training courses.

Contact PACE today to arrange a viewing of this impressive demonstration setup >

 

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

 
 

 

You might also be interested in reading...

 
 

PACE Stocking MLE Disconnectors

PACE and Morris Line Engineering recently confirmed they are expanding their long standing relationship to include PACE stocking MLE 1250Amp disconnector/switches.
Read More >

OMNIA’s 750MM Range of Adjustment

While UK Master Series shows a 500mm range of reach settings for Omnia, as Series 2 did previously, each Omnia version features a distance of 750mm between min and max range.
Read More >

Alternative Bonomi Bridge/Tunnel Arm Undergoing Testing

An alternative Bonomi Bonomi Bridge/Tunnel Arm design is currently undergoing testing in the UK as part of the ongoing drive to reduce the impact of bridge reconstruction on electrification projects.
Read More >

 
 
 
RIQS
RIQS
RIQS
RIQS