Connecting Technologies
T: +44 (0)1285 323 525    E:
PACE Networks
 

Mle’s 27m Demonstration Rig with Pear-drive Assembly

Morris Line Engineering are offering customers the chance to view a 27 metre installation of their pear-drive operating tube assembly at their factory in Bridgend. The installation demonstrates the simplicity of the design and its very impressive reach, as well give engineers a chance to get their hands on the product. It’s a busy time for Morris Line right now, with orders to Crossrail and Shenfield -Southend-Victoria, as well as product developments and new qualified installer training courses.

Contact PACE today to arrange a viewing of this impressive demonstration setup >

 

Subscribe to
the PACE Networks
Newsletter

 
 
Scroll Up