First PACE supply to EPC for Kemsley to Littlebrook

Further to achieving approval for use on the UK’s national grid, PACE is celebrating after being awarded a contract to supply Matthew Gap 4 Response vibration dampers to Babcock International. PACE was asked to supply over 3,400 RIBE vibration dampers to the Kemsley to Littlebrook project, which in itself signified the first time PACE has secured approval for a national grid item for supply to an EPC.

The 4 Response Vibration Damper is a so called “range-taking” design being suitable for 2 other conductor types, namely Rubus and Sorbus. The design’s ability to range-take allows for more flexibility in usage and lower stocking levels.

 

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

 
 

 

You might also be interested in reading...

 
 

PACE Stocking MLE Disconnectors

PACE and Morris Line Engineering recently confirmed they are expanding their long standing relationship to include PACE stocking MLE 1250Amp disconnector/switches.
Read More >

OMNIA’s 750MM Range of Adjustment

While UK Master Series shows a 500mm range of reach settings for Omnia, as Series 2 did previously, each Omnia version features a distance of 750mm between min and max range.
Read More >

Alternative Bonomi Bridge/Tunnel Arm Undergoing Testing

An alternative Bonomi Bonomi Bridge/Tunnel Arm design is currently undergoing testing in the UK as part of the ongoing drive to reduce the impact of bridge reconstruction on electrification projects.