Edinburgh Glasgow Improvement Programme

Between June 2013 and May 2014 overhead line equipment was installed from Springburn to Cumbernauld, enabling the use of electric traction units. As the first section of the much-discussed EGIP programme of works, this was a test bed for new equipment and new approaches in Scotland. In addition to supporting Bonomi Group in providing an extended range of OLE equipment, PACE collaborated with Network Rail, Carillion and Morris Line in the development of a new simple earthing switch.

View more Case Studies

 

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

 
 

 

You might also be interested in reading...

 
 

PACE Stocking MLE Disconnectors

PACE and Morris Line Engineering recently confirmed they are expanding their long standing relationship to include PACE stocking MLE 1250Amp disconnector/switches.
Read More >

OMNIA’s 750MM Range of Adjustment

While UK Master Series shows a 500mm range of reach settings for Omnia, as Series 2 did previously, each Omnia version features a distance of 750mm between min and max range.
Read More >

Alternative Bonomi Bridge/Tunnel Arm Undergoing Testing

An alternative Bonomi Bonomi Bridge/Tunnel Arm design is currently undergoing testing in the UK as part of the ongoing drive to reduce the impact of bridge reconstruction on electrification projects.