TDL Replacement – Oswestry to Legacy

The 132kV Heavy Duty Legacy to Oswestry Trident project was installed by BBUSL in 2015 with equipment supplied by SP Energy Networks. PACE supplied the Tension Insulators, E00897R-5 and the Line and Pilot Post Insulators, E00865A and E01054S to SP Energy Networks. The route modification is part of the 132kV Substation rebuild which is being up scaled to provide security and flexibility to the existing network in and around Oswestry. The insulators were manufactured to be exactly the same size as the trident specification from the eighties, therefore allowing a direct replacement of the existing old insulator technology and also providing huge savings in the reduction of change in other areas.

View more Case Studies

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

You might also be interested in reading...

Matt Kiely-Smith Joins PACE Networks Rail Team

PACE Networks’ offering to Electrified Railways grew in 2023, and in line with this, we increased the team servicing that market with the addition of Sales Engineer Matt Kiely-Smith.
Read More >

Contact Wire Measurement on Rigid Catenary – Network Rail Approved

Hastec Rail gained another Network Rail approval for their range of state-of-the-art surveying equipment, their Con-Tec Beam. Contact PACE Networks today to discuss a demonstration or trial of the Con-Tec or Con-Tec Beam.
Read More >

New Products in PACE Networks Stocks

PACE Networks began stocking and distributing rail electrification products in 2018 and is constantly reviewing the range of components and sub-systems held in our warehouse.
Read More >

 
RIQS
RIA
ISO 9001
Achilles
Cyber Essentials